BIN FARHOODUAE projects and business managementStart a project ↗
← Back to opportunities

ESUPPLY / tender_243478 / rfq_248224

Rotork actuator parts and maintenance components

Procurement scope

Project reference
tender_243478 / rfq_248224
Buyer
Dubai Municipality
Published
2026-10-15
Closes
2026-10-21 10:00 GST

Rotork actuator parts and maintenance components

Bid preparation

Prepare specifications, engineering or supply references, a technical response and local delivery plan; review bid and acceptance requirements together. The notice requires a Rotork Middle East conformity letter; check original part numbers.

Notice text
1
[040-10736] Rotork Actuator part, ABS ENCODER KIT ,DM-11157(Letter of conformity required from Rotork Middle east)
EA
5
2
[040-10737] PIEZO ASSY (TORQUE TRANSDUCER), DM-11158, (Letter of conformity required from Rotork Middle east)
EA
3
3
[040-10738] Piezo/Shaft 20:1, DM-11159,  (Letter of conformity required from Rotork Middle east),
EA
1
4
[040-10739] DM-11161,  BATTERY PLUG METAL(Letter of conformity required from Rotork Middle east)
EA
5
5
[040-10740] ELECTRONIC CHASSIS (POWER MODULE) WITH CONTACTOR TYPE 1, DM-11162, (Letter of conformity required from Rotork Middle east)
EA
2
6
[040-10741] Power Module / Contactor Type 1, DM-11163,  (Letter of conformity required from Rotork Middle east)
EA
1
7
[040-10742] LOGIC CONTROL PCB UNPROGRAMMED, DM-11164, (Letter of conformity required from Rotork Middle east),
EA
1
8
[040-10743] CPT PCB, DM-11165 (Letter of conformity required from Rotork Middle east)
EA
1
9
[040-10744] IQ2 B3/B4 COMP MAINT KIT, DM-11168, (Letter of conformity required from Rotork Middle east), ,
EA
1
10
[040-10745] (Letter of conformity required from Rotork Middle east), DM-11169, IQ3 B3/B4 COMP MAINT KIT
EA
1
11
[040-10746] SZ4/5 Comprehensive Maintenance Kit B3/B4, DM-11170, (Letter of conformity required from Rotork Middle east),
EA
1
12
[040-10747] HMI PCB KIT, DM-11171, (Letter of conformity required from Rotork Middle east)
EA
2
13
[040-10748] KNOB ASSEMBLY (BOTH), DM-11173, (Letter of conformity required from Rotork Middle east)
EA
5
14
[040-10749] IQ1-5 RESOLVER PCB, DM-11174, (Letter of conformity required from Rotork Middle east)
EA
3
15
[040-10750] METAL PLUG, DM-11175, (Letter of conformity required from Rotork Middle east)
EA
3
16
[040-10751] IQ2 PIEZO ASSY STD, DM-11176, (Letter of conformity required from Rotork Middle east)
EA
2
17
[040-10752] IQ1-3 CHASSIS TYP 1 PM + CONT, DM-11177, (Letter of conformity required from Rotork Middle east)
EA
2
18
[040-10753] IQ2 COMP MAINT KIT, DM-11180, (Letter of conformity required from Rotork Middle east)
EA
2
19
[040-10754] CONTROL PCB, DM-11181, (Letter of conformity required from Rotork Middle east)
EA
2
20
[040-10755] PCB IQ2 (UNPROG) ALL, DM-11178, (Letter of conformity required from Rotork Middle east),
EA
1
Total with VAT
*
VAT
*
Brand Name
*
Delivery Period in Days
*
Country of Origin
*
Supplier Item Description

Initial contract value scenario

AED 86,250–287,500

Scenario: 1 units at an assumed AED 75,000–250,000, plus 15% coordination and delivery. Assume one parts supply package; confirm exact models and quantities for line-item pricing.

DOCUMENTS

Notice and tender documents

Documents checked 2026-10-20 11:47 GST

Work on this opportunity

Send us the project reference, your capabilities, relevant experience and delivery plan. We coordinate eligibility review, scope confirmation and local bid preparation.

Work with us →

PLAN YOUR ENGAGEMENT

Questions to resolve before we start

Share your capabilities, project stage and target timing so we can agree the next step.

Send your brief ↗
What is this project buying, and when does it close?

tender_243478 / rfq_248224 — Rotork actuator parts and maintenance components. Dubai Municipality. 2026-10-21 10:00 GST.

How can we read and download the project files here?

1 notice documents are available to read and download on this page.

What should we prepare to work with you on this project?

Prepare specifications, engineering or supply references, a technical response and local delivery plan; review bid and acceptance requirements together. The notice requires a Rotork Middle East conformity letter; check original part numbers.

DIRECT ENQUIRY

Project enquiry

Send us your project brief.

For tenders, include the reference and your capabilities. For gifting, share the occasion, quantity and target date. We then agree the approach and quote before execution.

Send an emailleon@aimuse.ae ↗
China phone / WeChat15601678377Same number for WeChat and phone
Download the cooperation brief ↓