ESUPPLY / tender_231808 / rfq_236549

Old recycled-water pipe upgrade, phase 1

Procurement scope

Project reference
tender_231808 / rfq_236549
Buyer
Dubai Municipality
Published
2026-02-05
Closes
2026-10-29 08:00 GST

Old recycled-water pipe upgrade, phase 1

Bid preparation

Prepare matching models and specifications, supply or construction references, a local delivery plan and technical response; confirm quantities, acceptance and participation conditions against the project scope.

Notice text
Project Details
Project Code
tender_231808
Project Title
RW108-C1_Upgrading of Old Recycled Water Pipes - Phase 1
Opportunity Details
Description
Note: PART 1 - GENERAL ITEMS -
Note: Contractual Requirements -
A: Performance Security
Note: DM will reimburse the CONTRACTOR for Performance Security fees at cost, supported by the surety’s invoice. For the avoidance of doubt, the amount specified in the Bill of Quantities is only indicative and shall not be paid to the Contractor.  - 1 Sum
Note: The maximum amount for reimbursement of Performance Security fees shall not exceed the ceiling price, calculated as follows:
Performance security amount = 0.3% x (number of quarters in contract period) x (bidder price) x 10% (performance security amount)
Refer Preamble Clause b/6/E -
B: Insurance of the Works
Note: DM will reimburse the CONTRACTOR for insurance of work fees at cost, supported by the invoice. For the avoidance of doubt, the amount specified in the Bill of Quantities is only indicative and shall not be paid to the Contractor. The maximum amount for reimbursement of insurance of work fees shall not exceed the ceiling price and the ceiling price shall be equal to 0.15% of the bidder price.
Refer Preamble Clause b/7/A
- 1 Sum
C: Third Party Liability Insurance - 1 Sum
D: Workmen's Compensation Insurance - 1 Sum
Note: Specified Requirements  -
Note: Accommodation for the Engineer's Staff -
E: Establishment of offices for the Engineer's Staff - 1 Sum
F: Maintenance of offices for the Engineer's Staff - 720 Day
G: Removal of offices for the Engineer's staff - 1 Sum
Note: Services for the Engineer's Staff -
H: Four-wheel drive AC pickup vehicle with driver & fuel for Laboratory Testing - 720 Day
J: Telephone, telefax and internet facilities - 720 Day
K: Set of progress photographs - 24 Month
Note: Equipment for use by the Engineer's staff -
L: Establishment of office equipment - 1 Sum
M: Maintenance of office equipment - 720 Day
N: Removal of office equipment - 1 Sum
P: Establishment of surveying equipment (prior specific approval from Engineer to be obtained) - 1 Sum
Q: Maintenance of survey...
Notes
Supply Category
Other
Response Currency
AED
Opportunity Publication Date
05/02/2026 08:00
Closing date/time
29/10/2026 08:00
Published Lots
Published Lots
Row Number
Icon Column
Code
Title
Closing date/time
Action Column
1
RFQ/RFP
rfq_236549
RW108-C1 Upgrading of Old Recycled Water Pipes - Phase 1
---
Buyer Details
Buyer Organisation
Dubai Municipality
Contact
Email

Initial contract value scenario

AED 3,450,000–11,500,000

Scenario: 1 units at an assumed AED 3,000,000–10,000,000, plus 15% coordination and delivery. One assumed pipe-network upgrade delivery package; the public detail displays partial general conditions, while diameters, lengths and complete quantities await confirmation. This is not the buyer’s budget.

DOCUMENTS

Notice and tender documents

Review the project scope and cooperation arrangements on this page.

Work on this opportunity

Send us the project reference, your capabilities, relevant experience and delivery plan. We coordinate eligibility review, scope confirmation and local bid preparation.

Work with us →

PLAN YOUR ENGAGEMENT

Questions to resolve before we start

Share your capabilities, project stage and target timing so we can agree the next step.

Send your brief ↗
What is this project buying, and when does it close?

tender_231808 / rfq_236549 — Old recycled-water pipe upgrade, phase 1. Dubai Municipality. 2026-10-29 08:00 GST.

How can we read and download the project files here?

Review the project scope and cooperation arrangements on this page.

What should we prepare to work with you on this project?

Prepare matching models and specifications, supply or construction references, a local delivery plan and technical response; confirm quantities, acceptance and participation conditions against the project scope.

DIRECT ENQUIRY

Project enquiry

Send us your project brief.

For tenders, include the reference and your capabilities. For gifting, share the occasion, quantity and target date. We then agree the approach and quote before execution.

Send an emailleon@aimuse.ae ↗
China phone / WeChat15601678377Same number for WeChat and phone
Download the cooperation brief ↓